Completion rate of bridges to Deira Islands hits 75%

  • Date: 02-Feb-2020
  • Source: Emirates 24/7
  • Sector:Economy
  • Country:GCC
  • Who else needs to know?

Completion rate of bridges to Deira Islands hits 75%

Works cover the construction of three bridges of six lanes in each direction linked with the bridge crossing over the Water Canal.. The first of the three bridges is a two-lane bridge offering free-flowing traffic from Deira Islands to Al Khaleej Street Northwards while the second is a three-lane bridge providing free traffic from Deira Islands to Al Khaleej Street Southwards.. Three bridges will be constructed at the main entrances and exits of the project crossing the water canal, including two entrances at the intersections on Al Khaleej Street with Abu Baker Al-Siddique and Abu Hail Streets..