Work progresses on One Za’abeel project in Dubai with Tower B topped out

  • Date: 28-Feb-2021
  • Source: Gulf Business
  • Sector:Real Estate
  • Country:UAE
  • Who else needs to know?

Work progresses on One Za’abeel project in Dubai with Tower B topped out

Work is progressing on the One Za'abeel project in Dubai, with Tower B now topped out, contractor Alec Engineering and Contracting has confirmed.

The One Za'abeel project, which includes two towers and 'The Link' - claimed to be the world's longest cantilevered structure, is slated to be completed by Q4 2021.

Located adjacent to the Dubai World Trade Centre, the project - first launched in 2008 - is being developed by Ithra Dubai, a wholly-owned subsidiary of Investment Corporation of Dubai.

With a total built-up area of over 470,000 square metres, it includes luxury residences, a One & Only ultra-luxury hotel and serviced apartments, premium office spaces, a retail podium, and a sky concourse.

Read: One Za'abeel slated for Q4 2021 completion

Tower B - now topped out at 235 metres - includes seven basement levels, a ground floor, three podiums and 57-storeys with ultra-luxury residential units.

It also features an automated car parking system with three lifts and four shuttles. The system also has three transfer areas for entry and exit, which serves two levels and can accommodate 242 vehicles.

In total, 35,000 tonnes of rebar and 176,535 cubic metres of concrete were used in the overall construction of the project's Tower B, Alec said