Saudi’s SENDAN awarded new Contract from Saipem

Saudi’s SENDAN awarded new Contract from Saipem

SENDAN, Saudi Arabia announced that, recently it has signed a sizable Civil Construction work package with Saipem for BERRI ABU ALI DEVELOPMENT PROJECT – Package I and 2 Packages.

The purpose of this Project is increase the daily processing capacity of Arabian Light Crude by 250 MBCD in order to reach the Maximum Sustainable Capacity of the Berri field and SENDAN will mobilize approx. 1,000 manpower (Direct and Indirect) during 24 months of the contract period.

This Project shall provide a Gas-Oil Separation Plant (GOSP) comprised of separation traps and wet crude-handling FACILITIES.

Gas compression FACILITIES, gas dehydration & dew point control, a flare system, local stabilization, shipping pumps and hot oil system shall also be included. For the water injection plant, a heat recovery system will be added to the existing gas turbines. Associated utilities, including electrical, control / communication systems and infrastructure FACILITIES shall also be provided.