Dubai’s RTA opens key road project; 2 bridges of 4 lanes

  • Date: 22-Jan-2023
  • Source: Zawya
  • Sector:Real Estate
  • Country:UAE
  • Who else needs to know?

Dubai’s RTA opens key road project; 2 bridges of 4 lanes

Dubai’s Roads and Transport Authority (RTA) has opened the Sheikh Zayed bin Hamdan Al Nahyan Street Improvement Project extending 3 km from the intersection with the Dubai-Al Ain Road up to the Academic City Roundabout.

RTA also opened two 120-metre bridges at the intersection of Dubai Silicon Oasis, comprising four lanes in each direction. These improvements will raise the capacity to 14,400 vehicles per hour in both directions and ensure a smooth traffic flow in both directions of Sheikh Zayed bin Hamdan Al Nahyan Street.

The project is part of RTA’s master plan to improve roads, bridges, crossings, and tunnels to accommodate the growing traffic volumes and ease mobility across the emirate.

Serving Dubai Silicon Oasis, over 25 universities and colleges

The project serves Dubai Silicon Oasis, over 25 universities and colleges, and a student population of 27,500 in addition to the surrounding development projects. In the future, RTA plans to improve Sheikh Zayed bin Hamdan Al Nahyan Street in the sector from the Academic City to the intersection with Al Awir Street.

The project works include improving the entrances and exits of Sheikh Zayed bin Hamdan Al Nahyan Street by connecting with the intersection of Dubai-Al Ain Road, widening the Street to four lanes