DAMAC’s Cavalli Tower reaches new construction milestone

  • Date: 18-Jul-2023
  • Source: Zawya
  • Sector:Real Estate
  • Country:UAE
  • Who else needs to know?

DAMAC’s Cavalli Tower reaches new construction milestone

Works completed successfully over 25 hours Dubai, United Arab Emirates: Leading UAE-based developer DAMAC Properties has announced that its Cavalli Tower has achieved a significant milestone with the initial casting of the raft foundation on-site at Dubai Marina. The casting consisted of over 2,000 tonne of steel reinforcement and 4,500 cubic metres of concrete and was completed over a period of 25 hours. The substructure of the tower was designed under the supervision of the DAMAC technical team, while the contracting company China State executed the works in close coordination with DAMAC’s Project Management Team. The solidification of the foundation marks a critical phase in the construction of the 71 storey luxury residential tower that vows to set new standards in elegance and luxury in the Dubai skyline. The tower is expected to be completed in the second half of 2026 and will feature premiere interior designs by renowned Italian fashion house Roberto Cavalli and breathtaking views of Dubai’s renowned Palm Jumeriah. "This milestone is a testament to the dedication, skill, and meticulous planning that have gone into the construction of Cavalli Tower. With the foundation now in place, we are confident to move forward with increased momentum and fervour,